Based in Southern California, Swift Energy is one of the fastest growing solar installers in the industry with a sales team of over 250 reps. In this case study, we take a look at how they’ve achieved their incredible growth, including how they:
- Reduced their change orders to under 1%
- Achieved a 20 min time savings off every sales appointment
- Enabled their sales reps to create full solar designs in seconds
Swift Energy Saves Over 150 Hours Per Day and Eliminates Change Orders with Aurora AI and Sync API
